If user would like to do POS transaction which is on the previous date (The maximum period is only up to previous date).
User can utilize the timezone setup in Business Central to help.
Follow below steps
1, Open "My Settings"
2, Change the TimeZone
E.g. For HKT, today is 7/1/2025
E.g. Changed to Canada Time, the work date will be automatically changed.
3, Do the transaction as usual.
The date in POS transaction list will be marked as the work-date
4, Calculate Open Statement, the transaction will be recorded as 6/1/2025